Angola vs Lao People's Democratic Republic: Dealing with construction permits: Building quality control index
Dealing with construction permits: Building quality control index over time
- Angola
- Lao People's Democratic Republic
How they compare
Lao People's Democratic Republic currently reports 6.5 DB16-20 methodology against 6 DB16-20 methodology in Angola, a difference of 0.5 DB16-20 methodology.
That makes Lao People's Democratic Republic's figure about 1.1 times Angola's.
Across all 6 years both countries report, Lao People's Democratic Republic has been ahead every year.
Angola ranks 163rd and Lao People's Democratic Republic ranks 160th of 186 countries.
Lao People's Democratic Republic has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: building quality control index, Angola or Lao People's Democratic Republic?
- Lao People's Democratic Republic, at 6.5 DB16-20 methodology against 6 DB16-20 methodology in Angola as of 2019.
- What is the difference in dealing with construction permits: building quality control index between Angola and Lao People's Democratic Republic?
- 0.5 DB16-20 methodology, with Lao People's Democratic Republic ahead.
- How many years of comparable data are there for Angola and Lao People's Democratic Republic?
- 6 years are reported by both, from 2014 to 2019.
- How do Angola and Lao People's Democratic Republic rank globally for dealing with construction permits: building quality control index?
- Angola ranks 163rd and Lao People's Democratic Republic ranks 160th of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The building quality control index is the sum of the following six indices: quality of building regulations, quality control before construction, quality control during construction, quality control after construction, liability and insurance regimes and professional certifications. The component indicator is computed based on the methodology in the DB16-20 studies.