Austria vs Bosnia and Herzegovina: Dealing with construction permits: Building quality control index

Austria
13 DB16-20 methodology
in 2019
Bosnia and Herzegovina
13 DB16-20 methodology
in 2019
Austria rank
23rd
Bosnia and Herzegovina rank
23rd

Dealing with construction permits: Building quality control index over time

  • Austria
  • Bosnia and Herzegovina
051015201420162019

How they compare

Austria currently reports 13 DB16-20 methodology against 13 DB16-20 methodology in Bosnia and Herzegovina, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Bosnia and Herzegovina has been ahead every year.

Austria ranks 23rd and Bosnia and Herzegovina ranks 23rd of 186 countries.

Frequently asked questions

Which has higher dealing with construction permits: building quality control index, Austria or Bosnia and Herzegovina?
Austria, at 13 DB16-20 methodology against 13 DB16-20 methodology in Bosnia and Herzegovina as of 2019.
What is the difference in dealing with construction permits: building quality control index between Austria and Bosnia and Herzegovina?
0 DB16-20 methodology, with Austria ahead.
How many years of comparable data are there for Austria and Bosnia and Herzegovina?
6 years are reported by both, from 2014 to 2019.
How do Austria and Bosnia and Herzegovina rank globally for dealing with construction permits: building quality control index?
Austria ranks 23rd and Bosnia and Herzegovina ranks 23rd of 186 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Austria vs Bosnia and Herzegovina: Dealing with construction permits: Building quality control index. Statizoid. Retrieved 06 September 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-building-quality-control-index-0-15-db16-20-methodology-2/austria/bosnia-and-herzegovina/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-building-quality-control-index-0-15-db16-20-methodology-2/austria/bosnia-and-herzegovina/">Austria vs Bosnia and Herzegovina: Dealing with construction permits: Building quality control index</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 1,115 data points, 2014–2019
Last refreshed

The building quality control index is the sum of the following six indices: quality of building regulations, quality control before construction, quality control during construction, quality control after construction, liability and insurance regimes and professional certifications. The component indicator is computed based on the methodology in the DB16-20 studies.