Bahamas vs Bahrain: Dealing with construction permits: Building quality control index

Bahamas
12 DB16-20 methodology
in 2019
Bahrain
12 DB16-20 methodology
in 2019
Bahamas rank
50th
Bahrain rank
50th

Dealing with construction permits: Building quality control index over time

  • Bahamas
  • Bahrain
02.557.51012.5201420162019

How they compare

Bahamas currently reports 12 DB16-20 methodology against 12 DB16-20 methodology in Bahrain, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Bahrain has been ahead every year.

Bahamas ranks 50th and Bahrain ranks 50th of 186 countries.

Bahrain has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: building quality control index, Bahamas or Bahrain?
Bahamas, at 12 DB16-20 methodology against 12 DB16-20 methodology in Bahrain as of 2019.
What is the difference in dealing with construction permits: building quality control index between Bahamas and Bahrain?
0 DB16-20 methodology, with Bahamas ahead.
How many years of comparable data are there for Bahamas and Bahrain?
6 years are reported by both, from 2014 to 2019.
How do Bahamas and Bahrain rank globally for dealing with construction permits: building quality control index?
Bahamas ranks 50th and Bahrain ranks 50th of 186 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Bahamas vs Bahrain: Dealing with construction permits: Building quality control index. Statizoid. Retrieved 25 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-building-quality-control-index-0-15-db16-20-methodology-2/bahamas-the/bahrain/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-building-quality-control-index-0-15-db16-20-methodology-2/bahamas-the/bahrain/">Bahamas vs Bahrain: Dealing with construction permits: Building quality control index</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 1,115 data points, 2014–2019
Last refreshed

The building quality control index is the sum of the following six indices: quality of building regulations, quality control before construction, quality control during construction, quality control after construction, liability and insurance regimes and professional certifications. The component indicator is computed based on the methodology in the DB16-20 studies.