Botswana vs Tonga: Dealing with construction permits: Building quality control index (0-1

Botswana
10.5 DB16-20 methodology
in 2019
Tonga
10 DB16-20 methodology
in 2019
Botswana rank
101st
Tonga rank
104th

Dealing with construction permits: Building quality control index (0-1 over time

  • Botswana
  • Tonga
02.557.51012.5201420162019

How they compare

Botswana currently reports 10.5 DB16-20 methodology against 10 DB16-20 methodology in Tonga, a difference of 0.5 DB16-20 methodology.

That makes Botswana's figure about 1.1 times Tonga's.

The two have swapped places 1 time across 6 shared years of data; in 2014 it was Tonga ahead.

Botswana ranks 101st and Tonga ranks 104th of 183 countries.

Tonga has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: building quality control index (0-1, Botswana or Tonga?
Botswana, at 10.5 DB16-20 methodology against 10 DB16-20 methodology in Tonga as of 2019.
What is the difference in dealing with construction permits: building quality control index (0-1 between Botswana and Tonga?
0.5 DB16-20 methodology, with Botswana ahead.
How many years of comparable data are there for Botswana and Tonga?
6 years are reported by both, from 2014 to 2019.
How do Botswana and Tonga rank globally for dealing with construction permits: building quality control index (0-1?
Botswana ranks 101st and Tonga ranks 104th of 183 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The building quality control index is the sum of the following six indices: quality of building regulations, quality control before construction, quality control during construction, quality control after construction, liability and insurance regimes and professional certifications. The component indicator is computed based on the methodology in the DB16-20 studies.