Chad vs Denmark: Dealing with construction permits: Building quality control index (0-1

Chad
11.5 DB16-20 methodology
in 2019
Denmark
11 DB16-20 methodology
in 2019
Chad rank
79th
Denmark rank
80th

Dealing with construction permits: Building quality control index (0-1 over time

  • Chad
  • Denmark
02.557.51012.5201420162019

How they compare

Chad currently reports 11.5 DB16-20 methodology against 11 DB16-20 methodology in Denmark, a difference of 0.5 DB16-20 methodology.

Across all 6 years both countries report, Chad has been ahead every year.

Chad ranks 79th and Denmark ranks 80th of 183 countries.

Chad has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: building quality control index (0-1, Chad or Denmark?
Chad, at 11.5 DB16-20 methodology against 11 DB16-20 methodology in Denmark as of 2019.
What is the difference in dealing with construction permits: building quality control index (0-1 between Chad and Denmark?
0.5 DB16-20 methodology, with Chad ahead.
How many years of comparable data are there for Chad and Denmark?
6 years are reported by both, from 2014 to 2019.
How do Chad and Denmark rank globally for dealing with construction permits: building quality control index (0-1?
Chad ranks 79th and Denmark ranks 80th of 183 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The building quality control index is the sum of the following six indices: quality of building regulations, quality control before construction, quality control during construction, quality control after construction, liability and insurance regimes and professional certifications. The component indicator is computed based on the methodology in the DB16-20 studies.