Costa Rica vs Mozambique: Dealing with construction permits: Building quality control index

Costa Rica
11 DB16-20 methodology
in 2019
Mozambique
11 DB16-20 methodology
in 2019
Costa Rica rank
81st
Mozambique rank
81st

Dealing with construction permits: Building quality control index over time

  • Costa Rica
  • Mozambique
02.557.510201420162019

How they compare

Costa Rica currently reports 11 DB16-20 methodology against 11 DB16-20 methodology in Mozambique, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Mozambique has been ahead every year.

Costa Rica ranks 81st and Mozambique ranks 81st of 186 countries.

Frequently asked questions

Which has higher dealing with construction permits: building quality control index, Costa Rica or Mozambique?
Costa Rica, at 11 DB16-20 methodology against 11 DB16-20 methodology in Mozambique as of 2019.
What is the difference in dealing with construction permits: building quality control index between Costa Rica and Mozambique?
0 DB16-20 methodology, with Costa Rica ahead.
How many years of comparable data are there for Costa Rica and Mozambique?
6 years are reported by both, from 2014 to 2019.
How do Costa Rica and Mozambique rank globally for dealing with construction permits: building quality control index?
Costa Rica ranks 81st and Mozambique ranks 81st of 186 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Costa Rica vs Mozambique: Dealing with construction permits: Building quality control index. Statizoid. Retrieved 31 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-building-quality-control-index-0-15-db16-20-methodology-2/costa-rica/mozambique/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-building-quality-control-index-0-15-db16-20-methodology-2/costa-rica/mozambique/">Costa Rica vs Mozambique: Dealing with construction permits: Building quality control index</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 1,115 data points, 2014–2019
Last refreshed

The building quality control index is the sum of the following six indices: quality of building regulations, quality control before construction, quality control during construction, quality control after construction, liability and insurance regimes and professional certifications. The component indicator is computed based on the methodology in the DB16-20 studies.