Grenada vs Vanuatu: Dealing with construction permits: Building quality control index (0-1

Grenada
5 DB16-20 methodology
in 2019
Vanuatu
5 DB16-20 methodology
in 2019
Grenada rank
168th
Vanuatu rank
168th

Dealing with construction permits: Building quality control index (0-1 over time

  • Grenada
  • Vanuatu
012345201420162019

How they compare

Grenada currently reports 5 DB16-20 methodology against 5 DB16-20 methodology in Vanuatu, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Vanuatu has been ahead every year.

Grenada ranks 168th and Vanuatu ranks 168th of 183 countries.

Frequently asked questions

Which has higher dealing with construction permits: building quality control index (0-1, Grenada or Vanuatu?
Grenada, at 5 DB16-20 methodology against 5 DB16-20 methodology in Vanuatu as of 2019.
What is the difference in dealing with construction permits: building quality control index (0-1 between Grenada and Vanuatu?
0 DB16-20 methodology, with Grenada ahead.
How many years of comparable data are there for Grenada and Vanuatu?
6 years are reported by both, from 2014 to 2019.
How do Grenada and Vanuatu rank globally for dealing with construction permits: building quality control index (0-1?
Grenada ranks 168th and Vanuatu ranks 168th of 183 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The building quality control index is the sum of the following six indices: quality of building regulations, quality control before construction, quality control during construction, quality control after construction, liability and insurance regimes and professional certifications. The component indicator is computed based on the methodology in the DB16-20 studies.