Kuwait vs Mongolia: Dealing with construction permits: Building quality control index (0-1

Kuwait
14 DB16-20 methodology
in 2019
Mongolia
14 DB16-20 methodology
in 2019
Kuwait rank
8th
Mongolia rank
8th

Dealing with construction permits: Building quality control index (0-1 over time

  • Kuwait
  • Mongolia
051015201420162019

How they compare

Kuwait currently reports 14 DB16-20 methodology against 14 DB16-20 methodology in Mongolia, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Mongolia has been ahead every year.

Kuwait ranks 8th and Mongolia ranks 8th of 183 countries.

Frequently asked questions

Which has higher dealing with construction permits: building quality control index (0-1, Kuwait or Mongolia?
Kuwait, at 14 DB16-20 methodology against 14 DB16-20 methodology in Mongolia as of 2019.
What is the difference in dealing with construction permits: building quality control index (0-1 between Kuwait and Mongolia?
0 DB16-20 methodology, with Kuwait ahead.
How many years of comparable data are there for Kuwait and Mongolia?
6 years are reported by both, from 2014 to 2019.
How do Kuwait and Mongolia rank globally for dealing with construction permits: building quality control index (0-1?
Kuwait ranks 8th and Mongolia ranks 8th of 183 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The building quality control index is the sum of the following six indices: quality of building regulations, quality control before construction, quality control during construction, quality control after construction, liability and insurance regimes and professional certifications. The component indicator is computed based on the methodology in the DB16-20 studies.