Spain vs Thailand: Dealing with construction permits: Building quality control index

Spain
11 DB16-20 methodology
in 2019
Thailand
11 DB16-20 methodology
in 2019
Spain rank
81st
Thailand rank
81st

Dealing with construction permits: Building quality control index over time

  • Spain
  • Thailand
02.557.510201420162019

How they compare

Spain currently reports 11 DB16-20 methodology against 11 DB16-20 methodology in Thailand, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Thailand has been ahead every year.

Spain ranks 81st and Thailand ranks 81st of 185 countries.

Frequently asked questions

Which has higher dealing with construction permits: building quality control index, Spain or Thailand?
Spain, at 11 DB16-20 methodology against 11 DB16-20 methodology in Thailand as of 2019.
What is the difference in dealing with construction permits: building quality control index between Spain and Thailand?
0 DB16-20 methodology, with Spain ahead.
How many years of comparable data are there for Spain and Thailand?
6 years are reported by both, from 2014 to 2019.
How do Spain and Thailand rank globally for dealing with construction permits: building quality control index?
Spain ranks 81st and Thailand ranks 81st of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Spain vs Thailand: Dealing with construction permits: Building quality control index. Statizoid. Retrieved 22 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-building-quality-control-index-0-15-db16-20-methodology-2/spain/thailand/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-building-quality-control-index-0-15-db16-20-methodology-2/spain/thailand/">Spain vs Thailand: Dealing with construction permits: Building quality control index</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The building quality control index is the sum of the following six indices: quality of building regulations, quality control before construction, quality control during construction, quality control after construction, liability and insurance regimes and professional certifications. The component indicator is computed based on the methodology in the DB16-20 studies.