Botswana vs Central African Republic: Dealing with construction permits, cost
Dealing with construction permits, cost over time
- Botswana
- Central African Republic
How they compare
Central African Republic currently reports 194.0% against 172.7% in Botswana, a difference of 21.3%.
That makes Central African Republic's figure about 1.1 times Botswana's.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Botswana ahead.
Botswana ranks 34th and Central African Republic ranks 33rd of 50 countries.
Botswana has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Botswana | Central African Republic | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 290.3% | 126.6% | 163.7% | Botswana |
| 2010s | 207.0% | 139.0% | 68.0% | Botswana |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits, cost, Botswana or Central African Republic?
- Central African Republic, at 194.0% against 172.7% in Botswana as of 2012.
- What is the difference in dealing with construction permits, cost between Botswana and Central African Republic?
- 21.3%, with Central African Republic ahead.
- How many years of comparable data are there for Botswana and Central African Republic?
- 8 years are reported by both, from 2005 to 2012.
- How do Botswana and Central African Republic rank globally for dealing with construction permits, cost?
- Botswana ranks 34th and Central African Republic ranks 33rd of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Dealing with construction permits, cost (% of income per capita). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.