Chad vs Mauritania: Dealing with construction permits, cost

Chad
5,106.8%
in 2012
Mauritania
2,796.6%
in 2012
Chad rank
1st
Mauritania rank
3rd

Dealing with construction permits, cost over time

  • Chad
  • Mauritania
2.0k4.0k6.0k8.0k10.0k200520082012

How they compare

Chad currently reports 5,106.8% against 2,796.6% in Mauritania, a difference of 2,310.2%.

That makes Chad's figure about 1.8 times Mauritania's.

Across all 8 years both countries report, Chad has been ahead every year.

Chad ranks 1st and Mauritania ranks 3rd of 50 countries.

Chad has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Chad Mauritania Difference Ahead
2000s 7,643.5% 2,075.9% 5,567.6% Chad
2010s 6,005.5% 1,812.1% 4,193.4% Chad

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits, cost, Chad or Mauritania?
Chad, at 5,106.8% against 2,796.6% in Mauritania as of 2012.
What is the difference in dealing with construction permits, cost between Chad and Mauritania?
2,310.2%, with Chad ahead.
How many years of comparable data are there for Chad and Mauritania?
8 years are reported by both, from 2005 to 2012.
How do Chad and Mauritania rank globally for dealing with construction permits, cost?
Chad ranks 1st and Mauritania ranks 3rd of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Dealing with construction permits, cost (% of income per capita). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Chad vs Mauritania: Dealing with construction permits, cost. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 06 September 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-income-per-capita/chad/mauritania/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-income-per-capita/chad/mauritania/">Chad vs Mauritania: Dealing with construction permits, cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits, cost (% of income per capita)
Unit
% of income per capita
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.