Chad vs Sub-Saharan Africa (excluding high income): Dealing with construction permits, cost
Dealing with construction permits, cost over time
- Chad
- Sub-Saharan Africa (excluding high income)
How they compare
Chad currently reports 5,106.8% against 765.9% in Sub-Saharan Africa (excluding high income), a difference of 4,340.9%.
That makes Chad's figure about 6.7 times Sub-Saharan Africa (excluding high income)'s.
Across all 8 years both countries report, Chad has been ahead every year.
Chad ranks 1st and Sub-Saharan Africa (excluding high income) ranks 3rd of 50 countries.
Chad has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Chad | Sub-Saharan Africa (excluding high income) | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 7,643.5% | 2,152.0% | 5,491.5% | Chad |
| 2010s | 6,005.5% | 915.6% | 5,089.9% | Chad |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits, cost, Chad or Sub-Saharan Africa (excluding high income)?
- Chad, at 5,106.8% against 765.9% in Sub-Saharan Africa (excluding high income) as of 2012.
- What is the difference in dealing with construction permits, cost between Chad and Sub-Saharan Africa (excluding high income)?
- 4,340.9%, with Chad ahead.
- How many years of comparable data are there for Chad and Sub-Saharan Africa (excluding high income)?
- 8 years are reported by both, from 2005 to 2012.
- How do Chad and Sub-Saharan Africa (excluding high income) rank globally for dealing with construction permits, cost?
- Chad ranks 1st and Sub-Saharan Africa (excluding high income) ranks 3rd of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Dealing with construction permits, cost (% of income per capita). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.