Comoros vs Gabon: Dealing with construction permits, cost

Comoros
74.5%
in 2012
Gabon
79.3%
in 2012
Comoros rank
46th
Gabon rank
45th

Dealing with construction permits, cost over time

  • Comoros
  • Gabon
0255075100125200520082012

How they compare

Gabon currently reports 79.3% against 74.5% in Comoros, a difference of 4.8%.

That makes Gabon's figure about 1.1 times Comoros's.

The two have swapped places 2 times across 8 shared years of data; in 2005 it was Gabon ahead.

Comoros ranks 46th and Gabon ranks 45th of 50 countries.

Gabon has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Comoros Gabon Difference Ahead
2000s 82.7% 97.0% 14.3% Gabon
2010s 72.9% 81.8% 9.0% Gabon

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits, cost, Comoros or Gabon?
Gabon, at 79.3% against 74.5% in Comoros as of 2012.
What is the difference in dealing with construction permits, cost between Comoros and Gabon?
4.8%, with Gabon ahead.
How many years of comparable data are there for Comoros and Gabon?
8 years are reported by both, from 2005 to 2012.
How do Comoros and Gabon rank globally for dealing with construction permits, cost?
Comoros ranks 46th and Gabon ranks 45th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Dealing with construction permits, cost (% of income per capita). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Comoros vs Gabon: Dealing with construction permits, cost. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 04 September 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-income-per-capita/comoros/gabon/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-income-per-capita/comoros/gabon/">Comoros vs Gabon: Dealing with construction permits, cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits, cost (% of income per capita)
Unit
% of income per capita
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.