Congo, Democratic Republic of the vs Malawi: Dealing with construction permits, cost
Dealing with construction permits, cost over time
- Congo, Democratic Republic of the
- Malawi
How they compare
Congo, Democratic Republic of the currently reports 1,582.7% against 1,198.3% in Malawi, a difference of 384.4%.
That makes Congo, Democratic Republic of the's figure about 1.3 times Malawi's.
Across all 8 years both countries report, Congo, Democratic Republic of the has been ahead every year.
Congo, Democratic Republic of the ranks 8th and Malawi ranks 9th of 50 countries.
Congo, Democratic Republic of the has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Congo, Democratic Republic of the | Malawi | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 5,253.6% | 2,258.0% | 2,995.5% | Congo, Democratic Republic of the |
| 2010s | 1,711.0% | 1,193.5% | 517.5% | Congo, Democratic Republic of the |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits, cost, Congo, Democratic Republic of the or Malawi?
- Congo, Democratic Republic of the, at 1,582.7% against 1,198.3% in Malawi as of 2012.
- What is the difference in dealing with construction permits, cost between Congo, Democratic Republic of the and Malawi?
- 384.4%, with Congo, Democratic Republic of the ahead.
- How many years of comparable data are there for Congo, Democratic Republic of the and Malawi?
- 8 years are reported by both, from 2005 to 2012.
- How do Congo, Democratic Republic of the and Malawi rank globally for dealing with construction permits, cost?
- Congo, Democratic Republic of the ranks 8th and Malawi ranks 9th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Dealing with construction permits, cost (% of income per capita). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.