Djibouti vs Zambia: Dealing with construction permits, cost
Dealing with construction permits, cost over time
- Djibouti
- Zambia
How they compare
Djibouti currently reports 2,023.6% against 1,679.1% in Zambia, a difference of 344.5%.
That makes Djibouti's figure about 1.2 times Zambia's.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Zambia ahead.
Djibouti ranks 4th and Zambia ranks 6th of 50 countries.
Across the 2 decades both report, Djibouti averaged higher in 1 and Zambia in 1.
Head to head by decade
| Decade | Djibouti | Zambia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 2,313.2% | 3,770.5% | 1,457.4% | Zambia |
| 2010s | 2,045.8% | 2,034.9% | 10.9% | Djibouti |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits, cost, Djibouti or Zambia?
- Djibouti, at 2,023.6% against 1,679.1% in Zambia as of 2012.
- What is the difference in dealing with construction permits, cost between Djibouti and Zambia?
- 344.5%, with Djibouti ahead.
- How many years of comparable data are there for Djibouti and Zambia?
- 8 years are reported by both, from 2005 to 2012.
- How do Djibouti and Zambia rank globally for dealing with construction permits, cost?
- Djibouti ranks 4th and Zambia ranks 6th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Dealing with construction permits, cost (% of income per capita). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.