Madagascar vs Malawi: Dealing with construction permits, cost
Dealing with construction permits, cost over time
- Madagascar
- Malawi
How they compare
Malawi currently reports 1,198.3% against 1,116.9% in Madagascar, a difference of 81.4%.
That makes Malawi's figure about 1.1 times Madagascar's.
The two have swapped places 2 times across 8 shared years of data; in 2005 it was Malawi ahead.
Madagascar ranks 11th and Malawi ranks 9th of 50 countries.
Across the 2 decades both report, Madagascar averaged higher in 1 and Malawi in 1.
Head to head by decade
| Decade | Madagascar | Malawi | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 1,383.4% | 2,258.0% | 874.7% | Malawi |
| 2010s | 1,195.0% | 1,193.5% | 1.5% | Madagascar |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits, cost, Madagascar or Malawi?
- Malawi, at 1,198.3% against 1,116.9% in Madagascar as of 2012.
- What is the difference in dealing with construction permits, cost between Madagascar and Malawi?
- 81.4%, with Malawi ahead.
- How many years of comparable data are there for Madagascar and Malawi?
- 8 years are reported by both, from 2005 to 2012.
- How do Madagascar and Malawi rank globally for dealing with construction permits, cost?
- Madagascar ranks 11th and Malawi ranks 9th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Dealing with construction permits, cost (% of income per capita). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.