Mali vs Sao Tome and Principe: Dealing with construction permits, cost

Mali
418.6%
in 2012
Sao Tome and Principe
386.7%
in 2012
Mali rank
22nd
Sao Tome and Principe rank
24th

Dealing with construction permits, cost over time

  • Mali
  • Sao Tome and Principe
5001.0k1.5k200520082012

How they compare

Mali currently reports 418.6% against 386.7% in Sao Tome and Principe, a difference of 31.9%.

That makes Mali's figure about 1.1 times Sao Tome and Principe's.

The two have swapped places 3 times across 8 shared years of data; in 2005 it was Sao Tome and Principe ahead.

Mali ranks 22nd and Sao Tome and Principe ranks 24th of 50 countries.

Across the 2 decades both report, Mali averaged higher in 1 and Sao Tome and Principe in 1.

Head to head by decade

Decade Mali Sao Tome and Principe Difference Ahead
2000s 994.3% 1,118.1% 123.8% Sao Tome and Principe
2010s 416.0% 414.8% 1.1% Mali

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits, cost, Mali or Sao Tome and Principe?
Mali, at 418.6% against 386.7% in Sao Tome and Principe as of 2012.
What is the difference in dealing with construction permits, cost between Mali and Sao Tome and Principe?
31.9%, with Mali ahead.
How many years of comparable data are there for Mali and Sao Tome and Principe?
8 years are reported by both, from 2005 to 2012.
How do Mali and Sao Tome and Principe rank globally for dealing with construction permits, cost?
Mali ranks 22nd and Sao Tome and Principe ranks 24th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Dealing with construction permits, cost (% of income per capita). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Mali vs Sao Tome and Principe: Dealing with construction permits, cost. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 12 September 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-income-per-capita/mali/sao-tome-and-principe/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-income-per-capita/mali/sao-tome-and-principe/">Mali vs Sao Tome and Principe: Dealing with construction permits, cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits, cost (% of income per capita)
Unit
% of income per capita
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

Cost is recorded as a percentage of the economy’s income per capita. Only official costs are recorded. All the fees associated with completing the procedures to legally build a warehouse are recorded, including those associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; getting utility connections; and registering the warehouse property. Nonrecurring taxes required for the completion of the warehouse project also are recorded. The building code, information from local experts and specific regulations and fee schedules are used as sources for costs. If several local partners provide different estimates, the median reported value is used.