Congo, Democratic Republic of the vs Palestine, State of: Dealing with construction permits: Cost (% of Warehouse value) - Score
Dealing with construction permits: Cost (% of Warehouse value) - Score over time
- Congo, Democratic Republic of the
- Palestine, State of
How they compare
Palestine, State of currently reports 36.5% against 31.0% in Congo, Democratic Republic of the, a difference of 5.5%.
That makes Palestine, State of's figure about 1.2 times Congo, Democratic Republic of the's.
The two have swapped places 2 times across 15 shared years of data; in 2005 it was Palestine, State of ahead.
Congo, Democratic Republic of the ranks 174th and Palestine, State of ranks 173rd of 191 countries.
Congo, Democratic Republic of the has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Congo, Democratic Republic of the | Palestine, State of | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 0.0% | 0.0% | 0.0% | — |
| 2010s | 17.2% | 12.2% | 5.0% | Congo, Democratic Republic of the |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: cost (% of warehouse value) - score, Congo, Democratic Republic of the or Palestine, State of?
- Palestine, State of, at 36.5% against 31.0% in Congo, Democratic Republic of the as of 2019.
- What is the difference in dealing with construction permits: cost (% of warehouse value) - score between Congo, Democratic Republic of the and Palestine, State of?
- 5.5%, with Palestine, State of ahead.
- How many years of comparable data are there for Congo, Democratic Republic of the and Palestine, State of?
- 15 years are reported by both, from 2005 to 2019.
- How do Congo, Democratic Republic of the and Palestine, State of rank globally for dealing with construction permits: cost (% of warehouse value) - score?
- Congo, Democratic Republic of the ranks 174th and Palestine, State of ranks 173rd of 191 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The score for cost benchmarks economies with respect to the regulatory best practice on the indicator. The score ranges from 0 to 100, where 0 represents the worst regulatory performance and 100 the best regulatory performance.