Egypt vs Portugal: Dealing with construction permits: Cost (% of Warehouse value) - Score
Egypt
93.7%
in 2019
Portugal
94.2%
in 2019
Egypt rank
59th
Portugal rank
56th
Dealing with construction permits: Cost (% of Warehouse value) - Score over time
- Egypt
- Portugal
How they compare
Portugal currently reports 94.2% against 93.7% in Egypt, a difference of 0.5%.
Across all 15 years both countries report, Portugal has been ahead every year.
Egypt ranks 59th and Portugal ranks 56th of 191 countries.
Portugal has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Egypt | Portugal | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 44.6% | 90.4% | 45.8% | Portugal |
| 2010s | 87.1% | 93.0% | 5.9% | Portugal |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: cost (% of warehouse value) - score, Egypt or Portugal?
- Portugal, at 94.2% against 93.7% in Egypt as of 2019.
- What is the difference in dealing with construction permits: cost (% of warehouse value) - score between Egypt and Portugal?
- 0.5%, with Portugal ahead.
- How many years of comparable data are there for Egypt and Portugal?
- 15 years are reported by both, from 2005 to 2019.
- How do Egypt and Portugal rank globally for dealing with construction permits: cost (% of warehouse value) - score?
- Egypt ranks 59th and Portugal ranks 56th of 191 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The score for cost benchmarks economies with respect to the regulatory best practice on the indicator. The score ranges from 0 to 100, where 0 represents the worst regulatory performance and 100 the best regulatory performance.