Malaysia vs Serbia: Dealing with construction permits: Cost (% of Warehouse value) - Score
Malaysia
93.3%
in 2019
Serbia
93.0%
in 2019
Malaysia rank
60th
Serbia rank
62nd
Dealing with construction permits: Cost (% of Warehouse value) - Score over time
- Malaysia
- Serbia
How they compare
Malaysia currently reports 93.3% against 93.0% in Serbia, a difference of 0.3%.
Across all 15 years both countries report, Malaysia has been ahead every year.
Malaysia ranks 60th and Serbia ranks 62nd of 191 countries.
Malaysia has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Malaysia | Serbia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 99.1% | 0.0% | 99.1% | Malaysia |
| 2010s | 94.9% | 44.4% | 50.5% | Malaysia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: cost (% of warehouse value) - score, Malaysia or Serbia?
- Malaysia, at 93.3% against 93.0% in Serbia as of 2019.
- What is the difference in dealing with construction permits: cost (% of warehouse value) - score between Malaysia and Serbia?
- 0.3%, with Malaysia ahead.
- How many years of comparable data are there for Malaysia and Serbia?
- 15 years are reported by both, from 2005 to 2019.
- How do Malaysia and Serbia rank globally for dealing with construction permits: cost (% of warehouse value) - score?
- Malaysia ranks 60th and Serbia ranks 62nd of 191 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The score for cost benchmarks economies with respect to the regulatory best practice on the indicator. The score ranges from 0 to 100, where 0 represents the worst regulatory performance and 100 the best regulatory performance.