Albania vs El Salvador: Dealing with construction permits: Cost

Albania
6.8%
in 2019
El Salvador
6.3%
in 2019
Albania rank
42nd
El Salvador rank
45th

Dealing with construction permits: Cost over time

  • Albania
  • El Salvador
246810200520122019

How they compare

Albania currently reports 6.8% against 6.3% in El Salvador, a difference of 0.5%.

That makes Albania's figure about 1.1 times El Salvador's.

The two have swapped places 4 times across 11 shared years of data; in 2005 it was Albania ahead.

Albania ranks 42nd and El Salvador ranks 45th of 188 countries.

Albania has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Albania El Salvador Difference Ahead
2000s 5.6% 3.7% 1.9% Albania
2010s 6.0% 5.1% 0.8% Albania

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Albania or El Salvador?
Albania, at 6.8% against 6.3% in El Salvador as of 2019.
What is the difference in dealing with construction permits: cost between Albania and El Salvador?
0.5%, with Albania ahead.
How many years of comparable data are there for Albania and El Salvador?
11 years are reported by both, from 2005 to 2019.
How do Albania and El Salvador rank globally for dealing with construction permits: cost?
Albania ranks 42nd and El Salvador ranks 45th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Albania vs El Salvador: Dealing with construction permits: Cost. Statizoid. Retrieved 07 September 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/albania/el-salvador/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/albania/el-salvador/">Albania vs El Salvador: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.