Angola vs Cyprus: Dealing with construction permits: Cost
Dealing with construction permits: Cost over time
- Angola
- Cyprus
How they compare
Angola currently reports 1.0% against 0.9% in Cyprus, a difference of 0.1%.
That makes Angola's figure about 1.1 times Cyprus's.
Across all 12 years both countries report, Angola has been ahead every year.
Angola ranks 140th and Cyprus ranks 143rd of 188 countries.
Angola has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Angola | Cyprus | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 2.6% | 1.0% | 1.6% | Angola |
| 2010s | 1.8% | 1.0% | 0.7% | Angola |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: cost, Angola or Cyprus?
- Angola, at 1.0% against 0.9% in Cyprus as of 2019.
- What is the difference in dealing with construction permits: cost between Angola and Cyprus?
- 0.1%, with Angola ahead.
- How many years of comparable data are there for Angola and Cyprus?
- 12 years are reported by both, from 2008 to 2019.
- How do Angola and Cyprus rank globally for dealing with construction permits: cost?
- Angola ranks 140th and Cyprus ranks 143rd of 188 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.