Argentina vs Palau: Dealing with construction permits: Cost

Argentina
3.1%
in 2019
Palau
3.2%
in 2019
Argentina rank
84th
Palau rank
83rd

Dealing with construction permits: Cost over time

  • Argentina
  • Palau
0246200520122019

How they compare

Palau currently reports 3.2% against 3.1% in Argentina, a difference of 0.1%.

Across all 15 years both countries report, Palau has been ahead every year.

Argentina ranks 84th and Palau ranks 83rd of 188 countries.

Palau has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Argentina Palau Difference Ahead
2000s 1.3% 5.9% 4.6% Palau
2010s 3.5% 4.8% 1.3% Palau

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Argentina or Palau?
Palau, at 3.2% against 3.1% in Argentina as of 2019.
What is the difference in dealing with construction permits: cost between Argentina and Palau?
0.1%, with Palau ahead.
How many years of comparable data are there for Argentina and Palau?
15 years are reported by both, from 2005 to 2019.
How do Argentina and Palau rank globally for dealing with construction permits: cost?
Argentina ranks 84th and Palau ranks 83rd of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Argentina vs Palau: Dealing with construction permits: Cost. Statizoid. Retrieved 28 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/argentina/palau/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/argentina/palau/">Argentina vs Palau: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.