Bahamas vs Finland: Dealing with construction permits: Cost

Bahamas
0.8%
in 2019
Finland
0.7%
in 2019
Bahamas rank
147th
Finland rank
150th

Dealing with construction permits: Cost over time

  • Bahamas
  • Finland
00.511.5200520122019

How they compare

Bahamas currently reports 0.8% against 0.7% in Finland, a difference of 0.1%.

That makes Bahamas's figure about 1.1 times Finland's.

The two have swapped places 3 times across 13 shared years of data; in 2007 it was Finland ahead.

Bahamas ranks 147th and Finland ranks 150th of 188 countries.

Across the 2 decades both report, Bahamas averaged higher in 1 and Finland in 1.

Head to head by decade

Decade Bahamas Finland Difference Ahead
2000s 1.0% 1.1% 0.1% Finland
2010s 1.0% 0.8% 0.1% Bahamas

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Bahamas or Finland?
Bahamas, at 0.8% against 0.7% in Finland as of 2019.
What is the difference in dealing with construction permits: cost between Bahamas and Finland?
0.1%, with Bahamas ahead.
How many years of comparable data are there for Bahamas and Finland?
13 years are reported by both, from 2007 to 2019.
How do Bahamas and Finland rank globally for dealing with construction permits: cost?
Bahamas ranks 147th and Finland ranks 150th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Bahamas vs Finland: Dealing with construction permits: Cost. Statizoid. Retrieved 03 September 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/bahamas-the/finland/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/bahamas-the/finland/">Bahamas vs Finland: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.