Bahamas vs Oman: Dealing with construction permits: Cost

Bahamas
0.8%
in 2019
Oman
0.8%
in 2019
Bahamas rank
147th
Oman rank
147th

Dealing with construction permits: Cost over time

  • Bahamas
  • Oman
0.50.7511.21.51.8200520122019

How they compare

Bahamas currently reports 0.8% against 0.8% in Oman, a difference of 0.0%.

The two have swapped places 2 times across 13 shared years of data; in 2007 it was Oman ahead.

Bahamas ranks 147th and Oman ranks 147th of 188 countries.

Across the 2 decades both report, Bahamas averaged higher in 1 and Oman in 1.

Head to head by decade

Decade Bahamas Oman Difference Ahead
2000s 1.0% 1.1% 0.1% Oman
2010s 1.0% 0.7% 0.3% Bahamas

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Bahamas or Oman?
Bahamas, at 0.8% against 0.8% in Oman as of 2019.
What is the difference in dealing with construction permits: cost between Bahamas and Oman?
0.0%, with Bahamas ahead.
How many years of comparable data are there for Bahamas and Oman?
13 years are reported by both, from 2007 to 2019.
How do Bahamas and Oman rank globally for dealing with construction permits: cost?
Bahamas ranks 147th and Oman ranks 147th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Bahamas vs Oman: Dealing with construction permits: Cost. Statizoid. Retrieved 30 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/bahamas-the/oman/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/bahamas-the/oman/">Bahamas vs Oman: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.