Bahrain vs France: Dealing with construction permits: Cost

Bahrain
3.7%
in 2019
France
3.9%
in 2019
Bahrain rank
70th
France rank
69th

Dealing with construction permits: Cost over time

  • Bahrain
  • France
23456200520122019

How they compare

France currently reports 3.9% against 3.7% in Bahrain, a difference of 0.2%.

That makes France's figure about 1.1 times Bahrain's.

The two have swapped places 3 times across 13 shared years of data; in 2007 it was Bahrain ahead.

Bahrain ranks 70th and France ranks 69th of 188 countries.

Across the 2 decades both report, Bahrain averaged higher in 1 and France in 1.

Head to head by decade

Decade Bahrain France Difference Ahead
2000s 3.5% 1.6% 1.8% Bahrain
2010s 3.6% 4.2% 0.5% France

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Bahrain or France?
France, at 3.9% against 3.7% in Bahrain as of 2019.
What is the difference in dealing with construction permits: cost between Bahrain and France?
0.2%, with France ahead.
How many years of comparable data are there for Bahrain and France?
13 years are reported by both, from 2007 to 2019.
How do Bahrain and France rank globally for dealing with construction permits: cost?
Bahrain ranks 70th and France ranks 69th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Bahrain vs France: Dealing with construction permits: Cost. Statizoid. Retrieved 27 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/bahrain/france/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/bahrain/france/">Bahrain vs France: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.