Bahrain vs India: Dealing with construction permits: Cost

Bahrain
3.7%
in 2019
India
4.0%
in 2019
Bahrain rank
70th
India rank
67th

Dealing with construction permits: Cost over time

  • Bahrain
  • India
020406080200520122019

How they compare

India currently reports 4.0% against 3.7% in Bahrain, a difference of 0.3%.

That makes India's figure about 1.1 times Bahrain's.

Across all 13 years both countries report, India has been ahead every year.

Bahrain ranks 70th and India ranks 67th of 188 countries.

India has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Bahrain India Difference Ahead
2000s 3.5% 61.3% 57.8% India
2010s 3.6% 27.4% 23.7% India

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Bahrain or India?
India, at 4.0% against 3.7% in Bahrain as of 2019.
What is the difference in dealing with construction permits: cost between Bahrain and India?
0.3%, with India ahead.
How many years of comparable data are there for Bahrain and India?
13 years are reported by both, from 2007 to 2019.
How do Bahrain and India rank globally for dealing with construction permits: cost?
Bahrain ranks 70th and India ranks 67th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Bahrain vs India: Dealing with construction permits: Cost. Statizoid. Retrieved 24 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/bahrain/india/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/bahrain/india/">Bahrain vs India: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.