Bahrain vs Republic of Moldova: Dealing with construction permits: Cost
Dealing with construction permits: Cost over time
- Bahrain
- Republic of Moldova
How they compare
Bahrain currently reports 3.7% against 3.7% in Republic of Moldova, a difference of 0.0%.
The two have swapped places 2 times across 13 shared years of data; in 2007 it was Republic of Moldova ahead.
Bahrain ranks 70th and Republic of Moldova ranks 70th of 188 countries.
Across the 2 decades both report, Bahrain averaged higher in 1 and Republic of Moldova in 1.
Head to head by decade
| Decade | Bahrain | Republic of Moldova | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 3.5% | 5.3% | 1.8% | Republic of Moldova |
| 2010s | 3.6% | 2.9% | 0.7% | Bahrain |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: cost, Bahrain or Republic of Moldova?
- Bahrain, at 3.7% against 3.7% in Republic of Moldova as of 2019.
- What is the difference in dealing with construction permits: cost between Bahrain and Republic of Moldova?
- 0.0%, with Bahrain ahead.
- How many years of comparable data are there for Bahrain and Republic of Moldova?
- 13 years are reported by both, from 2007 to 2019.
- How do Bahrain and Republic of Moldova rank globally for dealing with construction permits: cost?
- Bahrain ranks 70th and Republic of Moldova ranks 70th of 188 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.