Bangladesh vs Jamaica: Dealing with construction permits: Cost

Bangladesh
1.6%
in 2019
Jamaica
1.5%
in 2019
Bangladesh rank
120th
Jamaica rank
122nd

Dealing with construction permits: Cost over time

  • Bangladesh
  • Jamaica
246810200520122019

How they compare

Bangladesh currently reports 1.6% against 1.5% in Jamaica, a difference of 0.1%.

That makes Bangladesh's figure about 1.1 times Jamaica's.

Across all 15 years both countries report, Bangladesh has been ahead every year.

Bangladesh ranks 120th and Jamaica ranks 122nd of 188 countries.

Bangladesh has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Bangladesh Jamaica Difference Ahead
2000s 7.8% 4.2% 3.6% Bangladesh
2010s 3.0% 1.9% 1.1% Bangladesh

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Bangladesh or Jamaica?
Bangladesh, at 1.6% against 1.5% in Jamaica as of 2019.
What is the difference in dealing with construction permits: cost between Bangladesh and Jamaica?
0.1%, with Bangladesh ahead.
How many years of comparable data are there for Bangladesh and Jamaica?
15 years are reported by both, from 2005 to 2019.
How do Bangladesh and Jamaica rank globally for dealing with construction permits: cost?
Bangladesh ranks 120th and Jamaica ranks 122nd of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Bangladesh vs Jamaica: Dealing with construction permits: Cost. Statizoid. Retrieved 06 September 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/bangladesh/jamaica/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/bangladesh/jamaica/">Bangladesh vs Jamaica: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.