Belize vs Sudan: Dealing with construction permits: Cost

Belize
2.4%
in 2019
Sudan
2.6%
in 2019
Belize rank
93rd
Sudan rank
91st

Dealing with construction permits: Cost over time

  • Belize
  • Sudan
051015200520122019

How they compare

Sudan currently reports 2.6% against 2.4% in Belize, a difference of 0.2%.

That makes Sudan's figure about 1.1 times Belize's.

The two have swapped places 2 times across 15 shared years of data; in 2005 it was Sudan ahead.

Belize ranks 93rd and Sudan ranks 91st of 187 countries.

Sudan has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Belize Sudan Difference Ahead
2000s 3.1% 14.5% 11.4% Sudan
2010s 2.6% 5.0% 2.4% Sudan

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Belize or Sudan?
Sudan, at 2.6% against 2.4% in Belize as of 2019.
What is the difference in dealing with construction permits: cost between Belize and Sudan?
0.2%, with Sudan ahead.
How many years of comparable data are there for Belize and Sudan?
15 years are reported by both, from 2005 to 2019.
How do Belize and Sudan rank globally for dealing with construction permits: cost?
Belize ranks 93rd and Sudan ranks 91st of 187 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Belize vs Sudan: Dealing with construction permits: Cost. Statizoid. Retrieved 22 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/belize/sudan/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/belize/sudan/">Belize vs Sudan: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.