Benin vs Djibouti: Dealing with construction permits: Cost

Benin
4.8%
in 2019
Djibouti
4.8%
in 2019
Benin rank
57th
Djibouti rank
57th

Dealing with construction permits: Cost over time

  • Benin
  • Djibouti
02468200520122019

How they compare

Benin currently reports 4.8% against 4.8% in Djibouti, a difference of 0.0%.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Benin ahead.

Benin ranks 57th and Djibouti ranks 57th of 188 countries.

Across the 2 decades both report, Benin averaged higher in 1 and Djibouti in 1.

Head to head by decade

Decade Benin Djibouti Difference Ahead
2000s 7.3% 5.9% 1.4% Benin
2010s 5.5% 6.3% 0.9% Djibouti

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Benin or Djibouti?
Benin, at 4.8% against 4.8% in Djibouti as of 2019.
What is the difference in dealing with construction permits: cost between Benin and Djibouti?
0.0%, with Benin ahead.
How many years of comparable data are there for Benin and Djibouti?
15 years are reported by both, from 2005 to 2019.
How do Benin and Djibouti rank globally for dealing with construction permits: cost?
Benin ranks 57th and Djibouti ranks 57th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Benin vs Djibouti: Dealing with construction permits: Cost. Statizoid. Retrieved 02 September 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/benin/djibouti/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/benin/djibouti/">Benin vs Djibouti: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.