Bolivia, Plurinational State of vs Gabon: Dealing with construction permits: Cost
Dealing with construction permits: Cost over time
- Bolivia, Plurinational State of
- Gabon
How they compare
Gabon currently reports 1.4% against 1.3% in Bolivia, Plurinational State of, a difference of 0.1%.
That makes Gabon's figure about 1.1 times Bolivia, Plurinational State of's.
The two have swapped places 3 times across 15 shared years of data; in 2005 it was Bolivia, Plurinational State of ahead.
Bolivia, Plurinational State of ranks 127th and Gabon ranks 124th of 188 countries.
Across the 2 decades both report, Bolivia, Plurinational State of averaged higher in 1 and Gabon in 1.
Head to head by decade
| Decade | Bolivia, Plurinational State of | Gabon | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 2.2% | 1.7% | 0.5% | Bolivia, Plurinational State of |
| 2010s | 1.4% | 1.4% | 0.1% | Gabon |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: cost, Bolivia, Plurinational State of or Gabon?
- Gabon, at 1.4% against 1.3% in Bolivia, Plurinational State of as of 2019.
- What is the difference in dealing with construction permits: cost between Bolivia, Plurinational State of and Gabon?
- 0.1%, with Gabon ahead.
- How many years of comparable data are there for Bolivia, Plurinational State of and Gabon?
- 15 years are reported by both, from 2005 to 2019.
- How do Bolivia, Plurinational State of and Gabon rank globally for dealing with construction permits: cost?
- Bolivia, Plurinational State of ranks 127th and Gabon ranks 124th of 188 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.