Botswana vs Mauritius: Dealing with construction permits: Cost
Dealing with construction permits: Cost over time
- Botswana
- Mauritius
How they compare
Botswana currently reports 0.4% against 0.4% in Mauritius, a difference of 0.0%.
The two have swapped places 1 time across 15 shared years of data; in 2005 it was Botswana ahead.
Botswana ranks 165th and Mauritius ranks 165th of 187 countries.
Botswana has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Botswana | Mauritius | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 5.7% | 0.5% | 5.2% | Botswana |
| 2010s | 1.5% | 0.6% | 1.0% | Botswana |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: cost, Botswana or Mauritius?
- Botswana, at 0.4% against 0.4% in Mauritius as of 2019.
- What is the difference in dealing with construction permits: cost between Botswana and Mauritius?
- 0.0%, with Botswana ahead.
- How many years of comparable data are there for Botswana and Mauritius?
- 15 years are reported by both, from 2005 to 2019.
- How do Botswana and Mauritius rank globally for dealing with construction permits: cost?
- Botswana ranks 165th and Mauritius ranks 165th of 187 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.