Brazil vs United Kingdom: Dealing with construction permits: Cost (% of Warehouse value)

Brazil
1.1%
in 2019
United Kingdom
1.1%
in 2019
Brazil rank
133rd
United Kingdom rank
133rd

Dealing with construction permits: Cost (% of Warehouse value) over time

  • Brazil
  • United Kingdom
11.522.533.5200520122019

How they compare

Brazil currently reports 1.1% against 1.1% in United Kingdom, a difference of 0.0%.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Brazil ahead.

Brazil ranks 133rd and United Kingdom ranks 133rd of 188 countries.

Brazil has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Brazil United Kingdom Difference Ahead
2000s 2.8% 1.0% 1.8% Brazil
2010s 1.4% 1.1% 0.2% Brazil

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Brazil or United Kingdom?
Brazil, at 1.1% against 1.1% in United Kingdom as of 2019.
What is the difference in dealing with construction permits: cost between Brazil and United Kingdom?
0.0%, with Brazil ahead.
How many years of comparable data are there for Brazil and United Kingdom?
15 years are reported by both, from 2005 to 2019.
How do Brazil and United Kingdom rank globally for dealing with construction permits: cost?
Brazil ranks 133rd and United Kingdom ranks 133rd of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Brazil vs United Kingdom: Dealing with construction permits: Cost. Statizoid. Retrieved 08 November 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/brazil/united-kingdom/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/brazil/united-kingdom/">Brazil vs United Kingdom: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.