Burkina Faso vs Kiribati: Dealing with construction permits: Cost

Burkina Faso
7.6%
in 2019
Kiribati
8.3%
in 2019
Burkina Faso rank
37th
Kiribati rank
34th

Dealing with construction permits: Cost over time

  • Burkina Faso
  • Kiribati
10152025200520122019

How they compare

Kiribati currently reports 8.3% against 7.6% in Burkina Faso, a difference of 0.7%.

That makes Kiribati's figure about 1.1 times Burkina Faso's.

The two have swapped places 2 times across 15 shared years of data; in 2005 it was Kiribati ahead.

Burkina Faso ranks 37th and Kiribati ranks 34th of 188 countries.

Kiribati has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Burkina Faso Kiribati Difference Ahead
2000s 16.5% 20.6% 4.0% Kiribati
2010s 9.6% 12.3% 2.8% Kiribati

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Burkina Faso or Kiribati?
Kiribati, at 8.3% against 7.6% in Burkina Faso as of 2019.
What is the difference in dealing with construction permits: cost between Burkina Faso and Kiribati?
0.7%, with Kiribati ahead.
How many years of comparable data are there for Burkina Faso and Kiribati?
15 years are reported by both, from 2005 to 2019.
How do Burkina Faso and Kiribati rank globally for dealing with construction permits: cost?
Burkina Faso ranks 37th and Kiribati ranks 34th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Burkina Faso vs Kiribati: Dealing with construction permits: Cost. Statizoid. Retrieved 09 September 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/burkina-faso/kiribati/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/burkina-faso/kiribati/">Burkina Faso vs Kiribati: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.