Cape Verde vs Yemen: Dealing with construction permits: Cost
Dealing with construction permits: Cost over time
- Cape Verde
- Yemen
How they compare
Cape Verde currently reports 1.0% against 0.9% in Yemen, a difference of 0.1%.
That makes Cape Verde's figure about 1.1 times Yemen's.
The two have swapped places 1 time across 11 shared years of data; in 2005 it was Yemen ahead.
Cape Verde ranks 140th and Yemen ranks 143rd of 188 countries.
Cape Verde has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Cape Verde | Yemen | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 1.8% | 1.8% | 0.0% | Cape Verde |
| 2010s | 1.2% | 1.0% | 0.2% | Cape Verde |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: cost, Cape Verde or Yemen?
- Cape Verde, at 1.0% against 0.9% in Yemen as of 2019.
- What is the difference in dealing with construction permits: cost between Cape Verde and Yemen?
- 0.1%, with Cape Verde ahead.
- How many years of comparable data are there for Cape Verde and Yemen?
- 11 years are reported by both, from 2005 to 2015.
- How do Cape Verde and Yemen rank globally for dealing with construction permits: cost?
- Cape Verde ranks 140th and Yemen ranks 143rd of 188 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.