Cameroon vs Ethiopia: Dealing with construction permits: Cost

Cameroon
17.6%
in 2019
Ethiopia
12.6%
in 2019
Cameroon rank
12th
Ethiopia rank
15th

Dealing with construction permits: Cost over time

  • Cameroon
  • Ethiopia
010203040200520122019

How they compare

Cameroon currently reports 17.6% against 12.6% in Ethiopia, a difference of 5.0%.

That makes Cameroon's figure about 1.4 times Ethiopia's.

The two have swapped places 3 times across 15 shared years of data; in 2005 it was Ethiopia ahead.

Cameroon ranks 12th and Ethiopia ranks 15th of 188 countries.

Across the 2 decades both report, Cameroon averaged higher in 1 and Ethiopia in 1.

Head to head by decade

Decade Cameroon Ethiopia Difference Ahead
2000s 14.5% 23.6% 9.1% Ethiopia
2010s 16.9% 15.6% 1.3% Cameroon

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Cameroon or Ethiopia?
Cameroon, at 17.6% against 12.6% in Ethiopia as of 2019.
What is the difference in dealing with construction permits: cost between Cameroon and Ethiopia?
5.0%, with Cameroon ahead.
How many years of comparable data are there for Cameroon and Ethiopia?
15 years are reported by both, from 2005 to 2019.
How do Cameroon and Ethiopia rank globally for dealing with construction permits: cost?
Cameroon ranks 12th and Ethiopia ranks 15th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Cameroon vs Ethiopia: Dealing with construction permits: Cost. Statizoid. Retrieved 25 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/cameroon/ethiopia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/cameroon/ethiopia/">Cameroon vs Ethiopia: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.