Colombia vs San Marino: Dealing with construction permits: Cost
Dealing with construction permits: Cost over time
- Colombia
- San Marino
How they compare
San Marino currently reports 7.3% against 6.9% in Colombia, a difference of 0.4%.
That makes San Marino's figure about 1.1 times Colombia's.
The two have swapped places 1 time across 8 shared years of data; in 2012 it was Colombia ahead.
Colombia ranks 41st and San Marino ranks 39th of 188 countries.
Colombia has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: cost, Colombia or San Marino?
- San Marino, at 7.3% against 6.9% in Colombia as of 2019.
- What is the difference in dealing with construction permits: cost between Colombia and San Marino?
- 0.4%, with San Marino ahead.
- How many years of comparable data are there for Colombia and San Marino?
- 8 years are reported by both, from 2012 to 2019.
- How do Colombia and San Marino rank globally for dealing with construction permits: cost?
- Colombia ranks 41st and San Marino ranks 39th of 188 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.