Congo vs Pakistan: Dealing with construction permits: Cost

Congo
9.3%
in 2019
Pakistan
8.8%
in 2019
Congo rank
27th
Pakistan rank
30th

Dealing with construction permits: Cost over time

  • Congo
  • Pakistan
051015200520122019

How they compare

Congo currently reports 9.3% against 8.8% in Pakistan, a difference of 0.5%.

That makes Congo's figure about 1.1 times Pakistan's.

Across all 15 years both countries report, Congo has been ahead every year.

Congo ranks 27th and Pakistan ranks 30th of 188 countries.

Congo has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Congo Pakistan Difference Ahead
2000s 12.1% 9.9% 2.2% Congo
2010s 9.5% 7.3% 2.2% Congo

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Congo or Pakistan?
Congo, at 9.3% against 8.8% in Pakistan as of 2019.
What is the difference in dealing with construction permits: cost between Congo and Pakistan?
0.5%, with Congo ahead.
How many years of comparable data are there for Congo and Pakistan?
15 years are reported by both, from 2005 to 2019.
How do Congo and Pakistan rank globally for dealing with construction permits: cost?
Congo ranks 27th and Pakistan ranks 30th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Congo vs Pakistan: Dealing with construction permits: Cost. Statizoid. Retrieved 25 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/congo-rep/pakistan/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/congo-rep/pakistan/">Congo vs Pakistan: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.