Costa Rica vs Kazakhstan: Dealing with construction permits: Cost
Dealing with construction permits: Cost over time
- Costa Rica
- Kazakhstan
How they compare
Kazakhstan currently reports 2.1% against 2.0% in Costa Rica, a difference of 0.1%.
That makes Kazakhstan's figure about 1.1 times Costa Rica's.
The two have swapped places 2 times across 15 shared years of data; in 2005 it was Kazakhstan ahead.
Costa Rica ranks 105th and Kazakhstan ranks 104th of 188 countries.
Across the 2 decades both report, Costa Rica averaged higher in 1 and Kazakhstan in 1.
Head to head by decade
| Decade | Costa Rica | Kazakhstan | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 3.0% | 4.9% | 1.9% | Kazakhstan |
| 2010s | 2.2% | 2.0% | 0.2% | Costa Rica |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: cost, Costa Rica or Kazakhstan?
- Kazakhstan, at 2.1% against 2.0% in Costa Rica as of 2019.
- What is the difference in dealing with construction permits: cost between Costa Rica and Kazakhstan?
- 0.1%, with Kazakhstan ahead.
- How many years of comparable data are there for Costa Rica and Kazakhstan?
- 15 years are reported by both, from 2005 to 2019.
- How do Costa Rica and Kazakhstan rank globally for dealing with construction permits: cost?
- Costa Rica ranks 105th and Kazakhstan ranks 104th of 188 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.