Georgia vs Hong Kong, China: Dealing with construction permits: Cost
Dealing with construction permits: Cost over time
- Georgia
- Hong Kong, China
How they compare
Georgia currently reports 0.3% against 0.3% in Hong Kong, China, a difference of 0.0%.
The two have swapped places 1 time across 15 shared years of data; in 2005 it was Georgia ahead.
Georgia ranks 172nd and Hong Kong, China ranks 172nd of 188 countries.
Georgia has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Georgia | Hong Kong, China | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 0.9% | 0.6% | 0.3% | Georgia |
| 2010s | 0.5% | 0.4% | 0.1% | Georgia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: cost, Georgia or Hong Kong, China?
- Georgia, at 0.3% against 0.3% in Hong Kong, China as of 2019.
- What is the difference in dealing with construction permits: cost between Georgia and Hong Kong, China?
- 0.0%, with Georgia ahead.
- How many years of comparable data are there for Georgia and Hong Kong, China?
- 15 years are reported by both, from 2005 to 2019.
- How do Georgia and Hong Kong, China rank globally for dealing with construction permits: cost?
- Georgia ranks 172nd and Hong Kong, China ranks 172nd of 188 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.