India vs Republic of Moldova: Dealing with construction permits: Cost

India
4.0%
in 2019
Republic of Moldova
3.7%
in 2019
India rank
67th
Republic of Moldova rank
70th

Dealing with construction permits: Cost over time

  • India
  • Republic of Moldova
020406080200520122019

How they compare

India currently reports 4.0% against 3.7% in Republic of Moldova, a difference of 0.3%.

That makes India's figure about 1.1 times Republic of Moldova's.

Across all 15 years both countries report, India has been ahead every year.

India ranks 67th and Republic of Moldova ranks 70th of 188 countries.

India has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade India Republic of Moldova Difference Ahead
2000s 70.1% 6.4% 63.7% India
2010s 27.4% 2.9% 24.4% India

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, India or Republic of Moldova?
India, at 4.0% against 3.7% in Republic of Moldova as of 2019.
What is the difference in dealing with construction permits: cost between India and Republic of Moldova?
0.3%, with India ahead.
How many years of comparable data are there for India and Republic of Moldova?
15 years are reported by both, from 2005 to 2019.
How do India and Republic of Moldova rank globally for dealing with construction permits: cost?
India ranks 67th and Republic of Moldova ranks 70th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

India vs Republic of Moldova: Dealing with construction permits: Cost. Statizoid. Retrieved 25 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/india/moldova/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/india/moldova/">India vs Republic of Moldova: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.