Jordan vs Palestine, State of: Dealing with construction permits: Cost
Dealing with construction permits: Cost over time
- Jordan
- Palestine, State of
How they compare
Palestine, State of currently reports 12.7% against 12.1% in Jordan, a difference of 0.6%.
Across all 15 years both countries report, Palestine, State of has been ahead every year.
Jordan ranks 17th and Palestine, State of ranks 14th of 188 countries.
Palestine, State of has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Jordan | Palestine, State of | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 16.9% | 38.3% | 21.4% | Palestine, State of |
| 2010s | 10.2% | 22.1% | 12.0% | Palestine, State of |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: cost, Jordan or Palestine, State of?
- Palestine, State of, at 12.7% against 12.1% in Jordan as of 2019.
- What is the difference in dealing with construction permits: cost between Jordan and Palestine, State of?
- 0.6%, with Palestine, State of ahead.
- How many years of comparable data are there for Jordan and Palestine, State of?
- 15 years are reported by both, from 2005 to 2019.
- How do Jordan and Palestine, State of rank globally for dealing with construction permits: cost?
- Jordan ranks 17th and Palestine, State of ranks 14th of 188 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.