Kenya vs Uzbekistan: Dealing with construction permits: Cost

Kenya
2.8%
in 2019
Uzbekistan
3.0%
in 2019
Kenya rank
89th
Uzbekistan rank
86th

Dealing with construction permits: Cost over time

  • Kenya
  • Uzbekistan
0246810200520122019

How they compare

Uzbekistan currently reports 3.0% against 2.8% in Kenya, a difference of 0.2%.

That makes Uzbekistan's figure about 1.1 times Kenya's.

The two have swapped places 2 times across 15 shared years of data; in 2005 it was Uzbekistan ahead.

Kenya ranks 89th and Uzbekistan ranks 86th of 188 countries.

Across the 2 decades both report, Kenya averaged higher in 1 and Uzbekistan in 1.

Head to head by decade

Decade Kenya Uzbekistan Difference Ahead
2000s 1.3% 8.0% 6.7% Uzbekistan
2010s 4.8% 4.0% 0.9% Kenya

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Kenya or Uzbekistan?
Uzbekistan, at 3.0% against 2.8% in Kenya as of 2019.
What is the difference in dealing with construction permits: cost between Kenya and Uzbekistan?
0.2%, with Uzbekistan ahead.
How many years of comparable data are there for Kenya and Uzbekistan?
15 years are reported by both, from 2005 to 2019.
How do Kenya and Uzbekistan rank globally for dealing with construction permits: cost?
Kenya ranks 89th and Uzbekistan ranks 86th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Kenya vs Uzbekistan: Dealing with construction permits: Cost. Statizoid. Retrieved 01 September 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/kenya/uzbekistan/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/kenya/uzbekistan/">Kenya vs Uzbekistan: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.