Kiribati vs Lebanon: Dealing with construction permits: Cost

Kiribati
8.3%
in 2019
Lebanon
7.7%
in 2019
Kiribati rank
34th
Lebanon rank
36th

Dealing with construction permits: Cost over time

  • Kiribati
  • Lebanon
510152025200520122019

How they compare

Kiribati currently reports 8.3% against 7.7% in Lebanon, a difference of 0.6%.

That makes Kiribati's figure about 1.1 times Lebanon's.

Across all 15 years both countries report, Kiribati has been ahead every year.

Kiribati ranks 34th and Lebanon ranks 36th of 188 countries.

Kiribati has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Kiribati Lebanon Difference Ahead
2000s 20.6% 7.4% 13.2% Kiribati
2010s 12.3% 6.7% 5.6% Kiribati

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Kiribati or Lebanon?
Kiribati, at 8.3% against 7.7% in Lebanon as of 2019.
What is the difference in dealing with construction permits: cost between Kiribati and Lebanon?
0.6%, with Kiribati ahead.
How many years of comparable data are there for Kiribati and Lebanon?
15 years are reported by both, from 2005 to 2019.
How do Kiribati and Lebanon rank globally for dealing with construction permits: cost?
Kiribati ranks 34th and Lebanon ranks 36th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Kiribati vs Lebanon: Dealing with construction permits: Cost. Statizoid. Retrieved 01 September 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/kiribati/lebanon/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/kiribati/lebanon/">Kiribati vs Lebanon: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.