Lao People's Democratic Republic vs Spain: Dealing with construction permits: Cost

Lao People's Democratic Republic
4.6%
in 2019
Spain
4.7%
in 2019
Lao People's Democratic Republic rank
61st
Spain rank
60th

Dealing with construction permits: Cost over time

  • Lao People's Democratic Republic
  • Spain
02468200520122019

How they compare

Spain currently reports 4.7% against 4.6% in Lao People's Democratic Republic, a difference of 0.1%.

The two have swapped places 2 times across 15 shared years of data; in 2005 it was Spain ahead.

Lao People's Democratic Republic ranks 61st and Spain ranks 60th of 188 countries.

Spain has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Lao People's Democratic Republic Spain Difference Ahead
2000s 1.3% 5.0% 3.7% Spain
2010s 4.7% 4.9% 0.3% Spain

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Lao People's Democratic Republic or Spain?
Spain, at 4.7% against 4.6% in Lao People's Democratic Republic as of 2019.
What is the difference in dealing with construction permits: cost between Lao People's Democratic Republic and Spain?
0.1%, with Spain ahead.
How many years of comparable data are there for Lao People's Democratic Republic and Spain?
15 years are reported by both, from 2005 to 2019.
How do Lao People's Democratic Republic and Spain rank globally for dealing with construction permits: cost?
Lao People's Democratic Republic ranks 61st and Spain ranks 60th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Lao People's Democratic Republic vs Spain: Dealing with construction permits: Cost. Statizoid. Retrieved 25 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/lao-pdr/spain/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/lao-pdr/spain/">Lao People's Democratic Republic vs Spain: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.