Lebanon vs San Marino: Dealing with construction permits: Cost
Dealing with construction permits: Cost over time
- Lebanon
- San Marino
How they compare
Lebanon currently reports 7.7% against 7.3% in San Marino, a difference of 0.4%.
That makes Lebanon's figure about 1.1 times San Marino's.
The two have swapped places 4 times across 8 shared years of data; in 2012 it was Lebanon ahead.
Lebanon ranks 36th and San Marino ranks 39th of 188 countries.
San Marino has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: cost, Lebanon or San Marino?
- Lebanon, at 7.7% against 7.3% in San Marino as of 2019.
- What is the difference in dealing with construction permits: cost between Lebanon and San Marino?
- 0.4%, with Lebanon ahead.
- How many years of comparable data are there for Lebanon and San Marino?
- 8 years are reported by both, from 2012 to 2019.
- How do Lebanon and San Marino rank globally for dealing with construction permits: cost?
- Lebanon ranks 36th and San Marino ranks 39th of 188 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.