Marshall Islands vs Philippines: Dealing with construction permits: Cost
Dealing with construction permits: Cost over time
- Marshall Islands
- Philippines
How they compare
Philippines currently reports 2.3% against 2.2% in Marshall Islands, a difference of 0.1%.
Across all 15 years both countries report, Philippines has been ahead every year.
Marshall Islands ranks 100th and Philippines ranks 97th of 188 countries.
Philippines has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Marshall Islands | Philippines | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 0.9% | 5.6% | 4.6% | Philippines |
| 2010s | 2.0% | 3.5% | 1.5% | Philippines |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: cost, Marshall Islands or Philippines?
- Philippines, at 2.3% against 2.2% in Marshall Islands as of 2019.
- What is the difference in dealing with construction permits: cost between Marshall Islands and Philippines?
- 0.1%, with Philippines ahead.
- How many years of comparable data are there for Marshall Islands and Philippines?
- 15 years are reported by both, from 2005 to 2019.
- How do Marshall Islands and Philippines rank globally for dealing with construction permits: cost?
- Marshall Islands ranks 100th and Philippines ranks 97th of 188 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.