Micronesia, Federated States of vs Norway: Dealing with construction permits: Cost
Dealing with construction permits: Cost over time
- Micronesia, Federated States of
- Norway
How they compare
Micronesia, Federated States of currently reports 0.6% against 0.6% in Norway, a difference of 0.0%.
The two have swapped places 3 times across 15 shared years of data; in 2005 it was Micronesia, Federated States of ahead.
Micronesia, Federated States of ranks 154th and Norway ranks 154th of 188 countries.
Micronesia, Federated States of has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Micronesia, Federated States of | Norway | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 0.8% | 0.6% | 0.2% | Micronesia, Federated States of |
| 2010s | 0.6% | 0.5% | 0.0% | Micronesia, Federated States of |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: cost, Micronesia, Federated States of or Norway?
- Micronesia, Federated States of, at 0.6% against 0.6% in Norway as of 2019.
- What is the difference in dealing with construction permits: cost between Micronesia, Federated States of and Norway?
- 0.0%, with Micronesia, Federated States of ahead.
- How many years of comparable data are there for Micronesia, Federated States of and Norway?
- 15 years are reported by both, from 2005 to 2019.
- How do Micronesia, Federated States of and Norway rank globally for dealing with construction permits: cost?
- Micronesia, Federated States of ranks 154th and Norway ranks 154th of 188 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.