Netherlands vs North Macedonia: Dealing with construction permits: Cost

Netherlands
3.6%
in 2019
North Macedonia
3.5%
in 2019
Netherlands rank
72nd
North Macedonia rank
74th

Dealing with construction permits: Cost over time

  • Netherlands
  • North Macedonia
246810200520122019

How they compare

Netherlands currently reports 3.6% against 3.5% in North Macedonia, a difference of 0.1%.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was North Macedonia ahead.

Netherlands ranks 72nd and North Macedonia ranks 74th of 188 countries.

North Macedonia has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Netherlands North Macedonia Difference Ahead
2000s 3.5% 8.5% 5.0% North Macedonia
2010s 3.9% 6.4% 2.6% North Macedonia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Netherlands or North Macedonia?
Netherlands, at 3.6% against 3.5% in North Macedonia as of 2019.
What is the difference in dealing with construction permits: cost between Netherlands and North Macedonia?
0.1%, with Netherlands ahead.
How many years of comparable data are there for Netherlands and North Macedonia?
15 years are reported by both, from 2005 to 2019.
How do Netherlands and North Macedonia rank globally for dealing with construction permits: cost?
Netherlands ranks 72nd and North Macedonia ranks 74th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Netherlands vs North Macedonia: Dealing with construction permits: Cost. Statizoid. Retrieved 31 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/netherlands/north-macedonia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/netherlands/north-macedonia/">Netherlands vs North Macedonia: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.